Conformity Plus Quality

For 75 years, Randolph & Baldwin has been manufacturing items to conform to the customers’ drawings. Yet, our success as a business is not only based on the conformity required by our customers, but on the quality of the finished product. In today’s world of manufacturing to a drawing, the supplier is presented with the […]

RAID & Eagle Eye Program Testimonials

Thanks a ton for the status and exceptional performance to our requirements… R&B continues to help make the RAID Program shine. Jeffrey D. Mullin Integrated Defense Systems Material Program Manager (MPM) RAID & Eagle Eye Programs

Raytheon Integrated Air Defense Center Testimonial

Thanks very much to Randolph and Baldwin for again supporting the AEGIS program on two critical floor shorts. Knowing that R&B usually has inventory from previous builds is comforting and has saved us countless times in the past. Even though the workload is heavy you still come through for us when asked. I consider you […]

Northrop Grumman Testimonial

I want to express my sincere gratitude for providing a sample for a piece of material that we’ve been trying to procure for quite some time. Your timely response and professional courtesy speaks volumes of you and your company. Warm regards, Ben Funderburk Material Manager & Sr. Logistics Analyst Northrop Grumman

Raytheon Integrated Defense Systems Testimonial

On behalf of the Saudi Patriot program, please pass along my sincere appreciation for the support provided by the team at Randolph & Baldwin. We recently needed prompt action on a request for materials to repair a critical cabinet that had been damaged during handling. Your prompt action and the response of our teammates at […]

High Point Notification: 27 August 2015

Emergency Need – Mission Critical. Call Friday 3 PM, Emergency Order Placed, Product Material Ordered Friday 6:45 PM, Inspection and ship Monday UPS overnight our cost.

High Point Notification: 03 September 2014

Emergency Need – Mission Critical. Call Friday 3 PM, Emergency Order Placed, Product Material Ordered Friday 6:45 PM, Inspection and ship Monday UPS overnight our cost.

High Point Notification: 01 May 2014

Emergency Need – Mission Critical. Call Friday 3 PM, Emergency Order Placed, Product Material Ordered Friday 6:45 PM, Inspection and ship Monday UPS overnight our cost.

High Point Notification: 10 April 2014

Emergency Need – Mission Critical. Call Friday 3 PM, Emergency Order Placed, Product Material Ordered Friday 6:45 PM, Inspection and ship Monday UPS overnight our cost.

High Point Notification: 04 April 2014

Emergency Need – Mission Critical. Call Friday 3 PM, Emergency Order Placed, Product Material Ordered Friday 6:45 PM, Inspection and ship Monday UPS overnight our cost.

RAID System – Big Success Through Small Business Partnering

Raytheon recognizes the value Small Businesses bring to Big Business and aggressively seeks opportunities to leverage unique technologies and capabilities. Read more about how Randolph and Baldwin works with Raytheon Company